This is the third remodeling job, for the Walter family, This email address is being protected from spambots. You need JavaScript enabled to view it.;

The challenge was to remodel the whole first floor, with new kitchen and new built ins, and prep for the future 2nd floor extension that will happen next.

Job was contracted in Design Build Partnering with MGT Construction, and Jose Suqui for Bath Remodel